Concrete-lead intelligence · Canada
Find it here first
We read every permit, rezoning and site plan four metros publish — every night — so structure trades hear about the job first.
Built by a working concrete contractor who got tired of hearing about towers after the bid list was full.
The problem
By the time it's in a plan room, you're one of fifteen
Today
You hear about the tower when the crane is up or the GC has already shortlisted. The plan-room stage is a price race — the relationships were built a year earlier, by whoever heard first.
With Earlyworks
The application hits the city's system — you see it that week. The shoring permit lands — you know dirt moves before the hoarding goes up. You make the call while there's still no bid list to be on.
What it does
Three questions, answered every morning
What's coming
Rezonings, site plans and tower applications, filed one to three years before a crane shows up. Every project links to the city's own file, sorted closest-to-ground-break first — an estimator's sheet, not a search engine.
When dirt moves
Shoring and foundation permits, inspection records, demolition clearances — the public signals that the structure package is being bought right now.
Who's behind it
Developers and applicants named on the city file — often before a GC exists, when a call still gets you in the room.
Never stale
Feeds re-pulled twice a day. Dead sources trigger an on-site alarm — never a silent gap.
Reasoning shown
Every claim carries its evidence and a link to the original record. Where a city doesn't publish something, we say so.
The pipeline, in numbers
Live counts, straight from the data
Where every project stands tonight
Live projects by metro

How it works
Cities publish. We read. You call first.
Cities publish the paper trail
Twenty-plus official feeds: permits, rezonings, site plans, inspections — Toronto, Vancouver, Calgary and Halifax metros.
We read and verify nightly
Every record is classified for concrete scope — storeys, parkade levels, stage — then re-checked against the city's own files, field by field.
You hear about it first
One sheet, sorted closest-to-ground-break. Save a project, and you'll know the morning it moves.
Early access
Earlyworks is in early access with a small founding group from the structure trades — formwork, shoring, rebar, pumping, cranes, ready-mix. Founding members lock their pricing for good and shape what gets built next. The tool is free to browse while we earn your trust.
Questions
Straight answers
Where does the data come from?
Only official city sources — open-data permit feeds, development application registers, council files. Every project links to the original record so you can check it yourself. Nothing is typed in by hand, and nothing is guessed.
How fresh is it?
Feeds are re-pulled twice a day, and a fresh sample is re-verified against the cities' own records every night, field by field. If a feed dies, the site says so on its face.
Which cities?
Toronto (with Mississauga, Brampton and York Region), Metro Vancouver (Vancouver, Surrey, Burnaby, Richmond, Coquitlam and more), Calgary, and Halifax. One city at a time, deep — not fifty cities thin.
Do you show when bids are open?
No — and be wary of anyone who claims to. Cities don't publish private bid windows. What we show instead is the honest proxy: excavation-stage permits and inspections that mean the structure is being bought right now.
What does it cost?
Browsing is free. Paid plans (flat per company, month to month, cancel or pause anytime) arrive with early access — founding members lock their rate for good.
Hear about the next tower first
Open the sheet for your city — today's pipeline, sorted closest to breaking ground.
See what's coming in your cityFree to browse. No card, no signup.